Stock Code: 300062

PV Integrated Substation

  • Ceepower Delivers Integrated Primary & Secondary PV Prefabricated Substation
    Ceepower Delivers Integrated Primary & Secondary PV Prefabricated Substation
    Dec 19, 2025
    Ceepower has completed the factory assembly and delivery of an integrated primary and secondary equipment prefabricated substation for a 4.68 MW rooftop distributed PV project at Sateri (Changzhou) Fiber Co., Ltd. (Phase II).      The project is EPC-contracted by Ceepower Group, responsible for the design and construction of the photovoltaic system.     Integrated Primary & Secondary System Design Primary–secondary integrated substations require coordinated system design, equipment manufacturing, and integration testing. Based on established capabilities in medium-voltage switchgear and prefabricated electrical modules, Ceepower implemented an integrated configuration covering: Primary equipment Protection and control systems Communication systems Integrated DC power supply Auxiliary and monitoring systems Internal environmental control       All equipment was manufactured, integrated, and system-tested at the factory prior to delivery, enabling complete module delivery and reduced on-site installation work, while supporting system consistency and stable operation.     Robust Enclosure for Project Requirements The prefabricated enclosure adopts a reinforced welded structure, combining a profiled steel frame with high-strength corrugated panels. The structure is designed to meet requirements for lifting, seismic resistance, and wind load, making it suitable for distributed renewable energy applications.       Factory Integration of Core Equipment The project uses Ceepower-manufactured medium-voltage switchgear, with panel coupling, electrical connections, and system commissioning completed inside the module. This approach reduces on-site construction activities and supports efficient project execution. The module is equipped with a slight positive-pressure HVAC system and engineered airflow design, combined with an industrial integrated ceiling, to provide a controlled operating environment and support operation and maintenance requirements.     The delivery marks the completion of an integrated primary–secondary prefabricated substation for application in a distributed photovoltaic project.          
    Read More

leave a message

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
submit

Our hours

Mon 11/21 - Wed 11/23: 9 AM - 8 PM
Thu 11/24: closed - Happy Thanksgiving!
Fri 11/25: 8 AM - 10 PM
Sat 11/26 - Sun 11/27: 10 AM - 9 PM
(all hours are Eastern Time)

Contact Us: global@ceepower.com

home

products

WhatsApp

Contact Us